Start with what you will run

The single biggest decision is what the shed needs to power. Write a list before you get quotes:

  • Lights and a few power points for a garden shed
  • A fridge, freezer or bar setup
  • Power tools, a compressor or a welder
  • Three-phase machinery
  • An EV charger or a future granny flat

It is far cheaper to lay a bigger cable once than to dig the trench twice.

How the power gets there

  • Underground cable is the usual way. It runs in conduit at a depth set by the wiring standard (AS/NZS 3000), with marker tape above it. Trench length, ground conditions and obstacles like driveways and pools drive the cost.
  • A sub-board in the shed makes sense for anything beyond a couple of circuits. It gives the shed its own breakers and safety switches, so a fault out there does not trip the house.
  • The house switchboard has to supply the new circuit. If it is old or full, it may need work first.

Outlets and lighting

  • 15 amp outlets for larger compressors, welders and some heaters
  • Three-phase outlets for three-phase machinery, if your property has a three-phase supply
  • LED battens or high-bay lights for good working light without heat
  • Emergency lighting for sheds used as workplaces or with people working late

Safety and the rules

All new circuits need safety switch protection. Electrical work in Queensland, including running cable to a shed, must be done by a licensed electrician, and we provide a certificate of testing and safety when it is finished. You can dig the trench yourself if you want to save money, but talk to us first about depth, route and conduit so it is done to standard.

From our job sheets

Recent shed and workshop jobs include high-bay and emergency lighting in a large shed, trenching and conduit to a new pit for outdoor lighting, a dedicated 15 amp outlet in a garage, and a three-phase cable run with a new three-phase outlet. Workshop jobs often lead to test and tag for the tools as well.

What it costs with us

Shed power is quoted in writing after a site visit, because distance, ground and what you are running decide the price. See shed and workshop electrical.

Sources

Common questions

Can't see your question? Call 0492 268 126 and talk to the team.

All guides

Can I run an extension lead to my shed instead?

Not as a permanent setup. Extension leads are not designed for constant use, outdoors or buried, and they are a common cause of tripping and damage.

Do I need a sub-board in my shed?

For more than a couple of circuits, or anything heavy-duty, yes. It keeps shed faults separate from the house.

Can I dig the trench myself?

Yes, if you agree the route, depth and conduit with us first. We then lay and connect the cable and test it.

Can you supply three-phase power to a shed?

If the property has a three-phase supply, yes. If it does not, we can talk through whether an upgrade is practical.

Related guides

Get a fast quote

Tell us the job. It takes about a minute.

Give a detailed description of your job.

Emergency or after hours? Call 0487 259 697

Privacy policy

Rather we sorted it?

Call the team or send the details for a fast quote. You'll have a clear price before any work starts.